top of page

CIVIL CONSTRUCTION - WELLINGTON

Client: Downer

​

Location: Wellington
 

Service: Civil construction

​

Date started: June 2022

​

​

Scope of work

Downer needs to install two new 11KV cables in 150mm ducts to connect the new substation on Custom House Quay, one of the busiest streets in Wellington.

​

​

Solution

Marais Laying NZ offered to use its experienced team with the help of our 10t & 3t excavator and Class 4 Trucks to trench and install the new ducts.

To haul the two new 11KV cables, we used our hauling gear (cable truck/winch/frame etc.)

Marais has designed and been providing its own traffic management for the duration of the project.

​

​

Results

Marais Laying NZ has been installing 200 meters of new trench with 3*150 mmp, hauling 400m of new 11KV cable.

​

​

Key facts:
  • Trench: 200 meters in carriageway, installing 3*150mmp

  • Hauling: 400 meters 11KV 185mm2 Al

  • Asphalt reinstatement: 200m2

  • Working on the busiest street of Wellington

​

Key equipment used:
  • 10t excavator

  • 3t excavator

  • Class 4 Trucks

  • Heavy Floor Saw

  • Winch

  • Cable truck