FIBRE CABLE INSTALLATION - ARTHUR'S PASS
Client: Ventia
​
Location: Arthur's Pass
​
Service: Civil UFB2+
​
Date started: February 2022
​
​
Scope of work
Ventia needed to install 5km of new fibre cable in Arthur’s Pass, one of the coldest places in Canterbury during the winter season (sub-zero temperatures).
​
Solution
Marais Laying NZ proposed using its experienced team with the help of our specialised machine Sidecut, 2.7 excavator, rock breakers and Class 1 Trucks to trench and install the new cables.
Marais has designed and provided its own traffic management for the duration of the project.
​
Result
Marais Laying NZ has been installing 100m of new trench and 300m of hauling daily.
​
Key facts
-
Trench: 100 meters in carriageway, install 1*100mmp
-
Hauling: 700 metres in carriageway without stopping traffic on SH73
-
Asphalt reinstatement: 150m2
-
Work on the main state highway connecting Canterbury and the West Coast.
​
Key equipment used
-
Hydro
-
2.7t Excavator
-
Class 1 trucks
-
Heavy floor saw
-
Winch