INSTALLATION OF THE NEW 11KV FEEDER 682 - WELLINGTON REGION

Client: Electra

​

Location: Waikanae - Wellington region

​

Service: Installation of the new 11kV Feeder 682 from Waikanae substation on Parata Street to Rauparaha Street

​

Date started: October 2019

Date completed: April 2020

​

Challenges

The project was created to install a new 11kV feeder to offload customers on feeder 672.

The Kapiti Coast District Council's long-term plan forecasts household growth of 400 additional residents in the area by 2023 and up to 3,500 residents by 2040. The peak load has reached the limit of the existing feeder capacity so to address the increasing growth in the region a new 11kV feeder was necessary.

​

Solution

With our solid experience in trenching and laying utility services, we managed to provide a turnkey package that met the client's expectations.

This project was diverse in terms of methodology, and we used all our experience and knowledge to complete it.

  • Drilling 110 mm

  • Trenching

  • Hauling 500m sections of cable 3*185 mm2 Al

  • Reinstatement (concrete/asphalt)

​

Result

This project allowed the business to grow and gave us a lot of visibility in the power industry in the Wellington region. Since this project, the team has been involved in other power installation projects all around Wellington.

 

Key facts:

  • 4.2 km of new 11kV installation (cable 3*185 mm2 Al)

  • 7 joints

  • New RMU installation

 

Key equipment used:

IMG_2036.jpg