ROAD CORRIDOR MAINTENANCE - AUCKLAND

Client: Liveable Streets

​

Location: Auckland – Central East

​

Service: Road Corridor Maintenance

 

Date started: September 2019

Date completed: October 2020

​

Challenges

Marais Laying NZ was chosen by Liveable Streets as one of the contractors for the RMC contract with Auckland Transport.

Planning and coordination with different suppliers was a challenge, as well as dealing with the public.

​

Solution

We delivered a turnkey package which included: services location, traffic management, subsoil drainage trenching and installation, kerb and channel laying, footpath reinstatement, while keeping both the client and residents happy.

​

Result

This project helped us gain experience in asphalt and concrete reinstatement.

​

Key facts:
  • 3,000m² of footpath replaced

  • 2,000m of subsoil installed

​

Key equipment used:
trencher and trenching.heic