ROAD CORRIDOR MAINTENANCE - AUCKLAND
Client: Liveable Streets
Location: Auckland – Central East
Service: Road Corridor Maintenance
Date started: September 2019
Date completed: October 2020
Challenges
Marais Laying NZ was chosen by Liveable Streets as one of the contractors for the RMC contract with Auckland Transport.
Planning and coordination with different suppliers was a challenge, as well as dealing with the public.
Solution
We delivered a turnkey package which included: services location, traffic management, subsoil drainage trenching and installation, kerb and channel laying, footpath reinstatement, while keeping both the client and residents happy.
Result
This project helped us gain experience in asphalt and concrete reinstatement.
Key facts:
-
3,000m² of footpath replaced
-
2,000m of subsoil installed
Key equipment used:
-
5 ton excavator