top of page
Search

[New case study] Surface mining in Harapaki Wind Farm

  • herveline0
  • May 29, 2023
  • 1 min read

Hick Bros Civil needed to build roads and pads for the future foundations for the Harapaki wind farm.

Tesmec proposed to use the new Tesmec TRS1150 surface miner to extract the lime out and to level the road to replace excavato

r with milling head or rock breaker.

 
 
 

コメント


Marais Laying New Zealand specialises in trenching and industrial cable laying, from large scale renewable projects and oil and gas pipelines, to telecommunications and power infrastructure.

© 2024 by Marais Laying New Zealand | All Rights Reserved

Terms of Use

  • LinkedIn
  • Facebook
bottom of page