[New case study] Installing fibre in the stunning but impractical fjords




As part of our collaboration with Downer and Chorus to install fibre in the fjords near Te Anau, we completed a final section from Manapouri to Blackmount.


To facilitate this work on this difficult site, we split the Manapouri to Blackmount link into two sections, north and south. Our team focused on the mole plough followed by trenching and drilling around bridges and obstacles.




Recent Posts

See All

A memorable team building

What a day we had last Friday! Marais Laying NZ's first-ever full team gathering was a hit. Our team-building challenge had us all flexing our strategic muscles in the sunshine, culminating in an epic